Long Lead Bush Camp

0 Ratings

Features

Popular

  • Pets Allowed
  • Free
  • Toilets
  • Allows fires

Popular

  • Pets Allowed
  • Free
  • Toilets
  • Drinking Water
  • BBQ Areas
  • Powered sites
  • Showers
  • Swimming
  • Allows fires

Activities

  • Water slide
  • Biking
  • Hiking
  • Fishing
  • Walking Trails
  • 4WD Trails
  • Bar

Type

  • Next to car
  • Allotted Site
  • Short walk to car
  • Caravans
  • Camper Trailers
  • Glamping
  • Cabins Available
  • Pub

For Kids

  • Jumping pillow
  • Horse riding
  • Kids play park
  • Organised kids activities
  • TAWK Supporters

Ownership

  • National Parks
  • State Forest
  • Independent
  • BIG4
  • Kui Parks
  • Aspen Parks
  • Discovery Holiday Parks
  • Family Parks
  • Reflections
  • Top Parks
  • NRMA
  • Holiday Haven
  • Ingenia

Access

  • Hike in
  • Car
  • 4WD only
  • Disabled Access

Other

  • Firewood for sale
  • Boat Ramp Nearby
  • Wifi
  • Phone Reception
  • Dump Spot
  • Garbage
  • Swimming pool
  • Water (Non Drinking)
  • Laundry
  • Coffee Nearby
  • Boat Cleaning Facilities
  • Cafe onsite
  • 4WD beach driving


Location

,
Victoria

Get directions

Details

Listing type
Campsite
Caravans
Yes

Average temperature

January
L 12°C
H 26°C
February
L 12°C
H 26°C
March
L 11°C
H 24°C
April
L 9°C
H 20°C
May
L 8°C
H 16°C
June
L 6°C
H 14°C
July
L 6°C
H 14°C
August
L 6°C
H 15°C
September
L 7°C
H 16°C
October
L 7°C
H 19°C
November
L 9°C
H 22°C
December
L 10°C
H 24°C
Source: Meteostat

Closest

Casterton Farm Supplies

18.45 km

Chargefox (standard)

45.18 km

Sherbrooke Estuary

259.44 km

Beach

160.82 km

Related lists

  • Top 10 campsites that allow fires near Mount Gambier, SA

    They say life is better around the campfire. And we could not agree more.  Over the years due to increase fire risk it's become a challenge to find great campsites that allow you to have a fire by your tent.  Please be a responsible Aircamper and brush up on your fire safety knowledge. Bushwalking NSW has a great article that'll give you the rundown on how to light a fire responsibly. Below we've collected some hidden gems near Mount Gambier, SA that still allow you to sit back, toast your feet and incinerate some marshmallows while telling stories about camping when you were a kid.

  • Top 10 campsites that allow fires near Digby, VIC

    They say life is better around the campfire. And we could not agree more.  Over the years due to increase fire risk it's become a challenge to find great campsites that allow you to have a fire by your tent.  Please be a responsible Aircamper and brush up on your fire safety knowledge. Bushwalking NSW has a great article that'll give you the rundown on how to light a fire responsibly. Below we've collected some hidden gems near Digby, VIC that still allow you to sit back, toast your feet and incinerate some marshmallows while telling stories about camping when you were a kid.

  • Top 10 campsites that allow fires near Canunda National Park, SA

    They say life is better around the campfire. And we could not agree more.  Over the years due to increase fire risk it's become a challenge to find great campsites that allow you to have a fire by your tent.  Please be a responsible Aircamper and brush up on your fire safety knowledge. Bushwalking NSW has a great article that'll give you the rundown on how to light a fire responsibly. Below we've collected some hidden gems near Canunda National Park, SA that still allow you to sit back, toast your feet and incinerate some marshmallows while telling stories about camping when you were a kid.

  • The top 10 coldest campsites in ACT for April

Nearby locations


Nearby campsites

Map attribution

© Mapbox © OpenStreetMap contributors

Download the anycamp app

Find the perfect campsite and contact them for availability. Browse photos, upload your own, save campsites and review the spots you have already been to.